Loading...

Proceedings of

3rd International Conference on Advances In Civil, Structural and Environmental Engineering ACSEE 2015

"ARE YOU A MIND READER, DESIGN-BUILDER? OBSERVATIONS ON EMPLOYERS‟ BEHAVIORS TO VARIATIONS IN PUBLIC PROJECTS"

ANNA YUH-MING YAN
DOI
10.15224/978-1-63248-065-1-49
Pages
82 - 85
Authors
1
ISBN
978-1-63248-065-1

Abstract: “Design-Build(D&B) contracts, compared with traditional Design-Bid-Build(D-B-B) contracts, are regarded as a total accountability style of contracting, with everybody on the same team. For public projects, D&B is a kind of relatively low risk procurement option for the employer, in terms of cost and time. As the stages of design and build can be carried out in parallel by the same party, the liability of design errors has been casted on the contractor. Therefore it is found the entitlements of variations in D&B projects are less than D-B-B projects. In this paper, the D&B projects completed between January 2010 and March 2015 were explored. There were 402 D&B projects among 7,082 civil engineering contracts in this period of time. It revealed that the main factors of variations of D&B projects in the past 5 years in Taiwan may be grouped as the changes of the employers’ requirements in design phase and the change orders in construction phases. The analysis of the factors of variation in”

Keywords: Design-Build (D&B), variation, employer’s requirement, change order

Download PDF